  • If the Schedule Performance Index (SPI) is greater than 1.0, what does this indicate?
  • How would you model holidays and non-working days within a CCPM or CPM schedule?
  • An organizational structure where employees report to both functional managers and project managers is called what?
  • Actual Output ÷ Design Capacity equals which measure?
  • The maximum output a facility can produce in a given period of time is called?
  • Break-even in units is calculated as Fixed Costs divided by which quantity?
  • When modeling iterative rework in a schedule, which approach is recommended?
  • Actual Output ÷ Effective Capacity equals which measure?
  • Which production approach uses an assembly-line setup with modules to create product variations?
  • How do activities differ from milestones, and why are milestones useful in scheduling?
  • Which statement about milestones is true?
  • Which dependency is outside project control?
  • How does the resource calendar affect scheduling decisions?
  • What is the primary purpose of a Work Breakdown Structure (WBS) in project planning?
  • Staffing changes, adjusting equipment, improving processes, redesigning products, and adding flexibility.
  • The break-even point in units depends on Fixed Costs and which per-unit measure?
  • Which statement best describes the forward pass in network scheduling?
  • The efficiency formula for weighted contribution is which expression?
  • Describe three-point estimating and how it is used in PERT to represent uncertainty.
  • Slack is defined as which of the following expressions?
  • In CCPM, which buffers protect the due date from variability and resource constraints?
  • How does a WBS connect to a network diagram to support scheduling?
  • Utilization capacity is defined as actual output divided by which measure?
  • A measure of how effectively inputs are transformed into outputs, defined as actual output divided by effective capacity.
  • Which statement about schedule baselining is most accurate?
  • PERT stands for which project scheduling approach?
  • Which statement best contrasts traditional waterfall scheduling with Agile planning?
  • How do working calendars, holidays, and non-working days affect task durations?
  • How should the schedule reflect risk management and contingency plans?
  • When multiple critical paths exist, how should you interpret them?
  • What is a Finish-to-Start dependency and how does it affect scheduling?
  • Which term describes the plan that allocates resources and sequences tasks to achieve objectives?
  • Which method is used to calculate latest start (LS) and latest finish (LF) times?
  • Which method uses probabilistic techniques to handle duration uncertainty?
  • Which management approach focuses on identifying and improving system constraints?
  • In CCPM, what is the role of feeding buffers?
  • How do holidays and non-working days get reflected in a project schedule?
  • Which timing value indicates the latest moment an activity can finish without causing a project delay?
  • When would you use a network diagram in scheduling?
  • Which statement best defines resource leveling in project scheduling and when should it be applied?
  • In CCPM, how are risks incorporated into the schedule?
  • Distinguish FF and SS constraints with concrete examples.
  • In PMBOK, what planning activities pertain to scheduling?
  • Which scheduling tool is primarily used to visualize dependencies and compute the critical path?
  • Which term describes the top-down plan showing the sequence and timing of project activities?
  • What is the function of a resource buffer in CCPM?
  • What is the proper course when a change is approved but requires updating the baseline?
  • Which metrics extend schedule performance assessment beyond CPI and SPI?
  • Which project scheduling technique uses probabilistic time estimates?
  • What term describes the processing time of the slowest workstation in a manufacturing system?
  • What best explains the difference between effort and duration and why estimation confusion occurs?
  • How would you handle a scenario with a non-linear learning curve affecting task durations?
  • Name two techniques for schedule compression.
  • How does the Critical Path Method (CPM) determine the minimum project duration?
  • Which timing value is calculated as the finish time minus the duration of the activity?
  • Which process strategy is most suitable for high-volume production with a limited product set?
  • What are the limitations of CPM when durations are uncertain and variability exists?
  • In the WBS, what is the smallest unit of work that can be assigned and measured?
  • In CCPM, what is the purpose of feeding buffers?
  • What is the purpose of a risk-adjusted schedule?
  • Which set of steps involves identifying the constraint, developing a plan, focusing resources, reducing constraint effects, and repeating the process?
  • What is the effect of reflecting holidays and non-working days in calendars on task durations?
  • Actual Output ÷ Design Capacity equals which measure?
  • Which statement best describes the role of the schedule baseline?
  • What are the limitations of Gantt charts for complex projects?
  • What are Level-of-Effort (LOE) tasks and how should they be treated in schedules?
  • In earned value management, what does EAC equal under a CPI-based approach, assuming remaining work will be performed at the current cost performance rate?
  • How should you plan for external dependencies in scheduling?
  • What is Monte Carlo scheduling analysis and what outputs does it produce?
  • Which scenario calls for a program-level schedule rather than a single-project schedule?
  • Relating people, money, and supplies to project activities and determining activity timing describes which process?
  • Which topic is typically covered under Equipment Selection Factors?
  • Which constraint describes that the start of the successor must align with the start of the predecessor?
  • A hierarchical breakdown of a project into smaller tasks and activities is called what?
  • Which concept describes the attributes of effective project leaders, including communication and the ability to organize activities from different disciplines?
  • Which are the four dependency types used in PDM?
  • What triggers a schedule change and what is the purpose of a schedule baseline change control process?
  • Which statement correctly describes Schedule Variance (SV) and its sign?
  • Which production approach is characterized by low-volume, high-variety production using general-purpose equipment and skilled workers?
  • In scheduling, what is a baseline used for?
  • Examining workflows to determine how efficiently inputs are transformed into outputs is called?
  • If two or more feasible paths have zero total float, what should you consider to determine the actual critical path?
  • What is the role of schedule baselining in performance reporting and forecasting?
  • What is a typical outcome of a Monte Carlo schedule risk analysis?
  • Which method is used to calculate earliest start (ES) and earliest finish (EF) times?
  • Which of the following represents a dependency in project scheduling?
  • Compare analogous, parametric, and bottom-up duration estimation methods, with pros and cons.
  • What is resource leveling and when is it used?
  • What is the purpose of a schedule baseline change control process?
  • Utilization capacity is calculated as actual output divided by which denominator?
  • What is Schedule Float and how is it useful for project managers?
  • In MS Project, how do task type choices affect scheduling when calendars change?
  • Describe Start-to-Start (SS) and Finish-to-Finish (FF) dependencies and give real-world examples.
  • Project → Major tasks → Subtasks → Activities (work packages) represents which concept?
  • The ability to respond to changes with little penalty in time, cost, or customer value is known as what?
  • What constitutes schedule quality and how can you measure it?
  • What is the term for a temporary structure that uses specialists from across the company to complete a project?
  • Which process strategy uses an assembly-line approach to support product variation?
  • Which of the following is NOT typically part of the scheduling process in PMBOK?
  • The earliest time an activity can begin after all predecessors are completed.
  • What is the purpose of a schedule risk register?
  • Which statement best describes a program-level schedule?
  • The latest time an activity can finish without delaying the project.
  • Which planning approach best supports evolving requirements by progressively detailing near-term work?
  • What is 'critical chain' thinking and how does it differ from traditional CPM scheduling?
  • Which of the following best describes crashing a project schedule?
  • Which of the following statements is a common limitation of Gantt charts?
  • Which statement best describes CCPM buffering concepts?
  • Which term describes the approach used to transform inputs into outputs that meet customer requirements and operational goals?
  • How do milestone charts differ from network diagrams in purpose and use?
  • Rolling Wave Planning is best described as planning in detail for near-term work while keeping far-term work high-level to adapt as details emerge.
  • What is the term for shortening a project duration by adding resources to activities on the critical path?
  • In scheduling, which calculation propagates from the start to compute earliest times (ES and EF)?
  • In a Finish-to-Start (FS) dependency, which statement is true?
  • The expression Cm × percent of sales is best described as:
  • Explain the difference between a baseline schedule and a progress schedule in PM software.
  • Break-even in sales dollars is Fixed Costs divided by which metric?
  • Distinguish between total float and free float and what each implies for scheduling.
  • Which statement best describes crashing in project scheduling?
  • What is the longest path through the project network that determines the shortest possible completion time?
  • What is the term for the visual bar chart showing project activities and their timelines?
  • How are Early Start, Early Finish, Late Start, and Late Finish values computed in a project network?
  • How do you identify and manage a resource overload in a schedule?
  • During the forward pass, how is ES determined for an activity with multiple predecessors?
  • Which dependency type is defined by best practices or preferred logic rather than hard constraints?
  • In scheduling, when would you typically apply resource smoothing rather than leveling?
  • The ratio of actual output to design capacity is called which term?
  • How is a Monte Carlo simulation used to estimate schedule risk?
  • Which timing metric represents the total time a unit spends in the system from start to finish, including waiting and processing?
  • What is a schedule baseline?
  • Which statement about the levels of a Work Breakdown Structure is true?
  • Which metrics are commonly used to assess schedule quality?
  • How does Monte Carlo simulation contribute to schedule risk analysis?
  • Which concept is described as providing customized products while maintaining efficient production?
  • Which statement describes the three major project management functions?
  • LF − activity duration.
  • Differentiate resource leveling and resource smoothing.
  • Which production approach is associated with high-volume, low-variety production and continuous processes?
  • What is the term for the amount of time an activity can be delayed without delaying the overall project?
  • How does risk quantification influence schedule decisions?
  • How do you identify the critical path in a project network with multiple feasible paths?
  • How does risk-adjusted scheduling typically affect sequencing?
  • Who is primarily responsible for ensuring project activities are completed on time, within budget, and meet quality goals?
  • How should schedule changes be managed?
  • Forecast demand, match technology with sales volume, find optimal operating size, and build flexibility.
  • What is a resource histogram used for in project planning?
  • The step in a process with the lowest capacity that limits overall output is called?
  • If an activity has zero total float, what does delaying it imply?
  • Efficiency capacity is defined as actual output divided by which quantity?
  • The real output achieved after accounting for disruptions is called?
  • Which describes Identify constraint → Develop plan → Focus resources → Reduce constraint effects → Repeat process.
  • What does fast-tracking involve and what risks does it introduce?
  • Actual Output ÷ Design Capacity equals which measure?
  • The weighted contribution is equal to which expression?
  • Which statement correctly defines Schedule Performance Index (SPI) and its interpretation?
  • What is the difference between external and internal dependencies?
  • Which of the following statements about resource leveling is correct?
  • Which process focuses on monitoring resources, costs, quality, and budgets and revising plans when needed?
  • Which term encompasses the four process strategies used in operations management?
  • What does CPM stand for in project scheduling?
  • Which of the following best describes when you would adopt a program-level schedule?
  • Which statement accurately compares PDM and ADM network diagrams?
  • What is a RACI matrix and how does it relate to scheduling?
  • In Critical Chain Project Management, what is the purpose of schedule buffers (project and feeding) and how are they used?
  • What is the role of milestones in earned value management and schedule reporting?
  • How does a constraint differ from a dependency?
  • Break-even in dollars is Fixed Costs divided by which of the following?
  • How do you model iterative rework or loops in a schedule?
  • Which process strategy combines the flexibility of process focus with the efficiency of product focus to enable customization?
  • Define the critical path and explain how float determines schedule flexibility.
  • Actual Output ÷ Effective Capacity equals which measure?
  • Distinguish schedule risk register from project risk register and explain their roles in schedule management.
  • A Schedule Performance Index (SPI) of exactly 1 indicates what?
  • How is a schedule baseline used in performance measurement and control?
  • Efficiency capacity is calculated as actual output divided by which quantity?
  • Which statement best describes resource-constrained scheduling and its impact on the critical path?
  • Which practice most improves schedule reliability in a multi-project environment?
  • How is the PERT expected duration calculated, and what distribution is assumed?
  • In earned value management, which statement about schedule variance (SV) and cost variance (CV) signs is correct?
  • The total time required for a unit to pass through the entire production process.
  • Which EVM metric is used to forecast future performance by estimating how much work remains?
  • What is the main purpose of the project scheduling?
  • Which term identifies the step in a process with the lowest capacity that limits overall output?
  • Which of the following is a capability of project management tools like MS Project for managing dependencies and constraints?
  • Which statement best describes the role of a Gantt chart in project scheduling?
  • What does crashing mean in project scheduling?
  • What is the difference between lead time and lag time in scheduling?
  • How do you validate a schedule's realism and reliability before baselining?
  • Which of the following is not typically considered a project scheduling technique?
  • List advantages and limitations of Gantt charts for project scheduling.
  • How does a Work Breakdown Structure support cost estimation?
  • How does duration estimation differ between PERT and CPM?
  • In project management, what describes a hierarchical breakdown of a project into smaller tasks and activities?
  • Which production strategy aims for rapid, low-cost production by balancing flexibility with efficiency?
  • Why is it important to separate effort from duration in schedule planning?
  • What is the difference between total float and free float?
  • Classify dependencies as mandatory, discretionary, external, and internal. Which option correctly matches the definitions?
  • ES + activity duration.
  • Which concept allows a successor activity to start before its predecessor finishes?
  • Reevaluating and improving processes to increase efficiency or reduce cost is called?
  • Outline the forward pass to compute Early Start (ES) and Early Finish (EF) for a network diagram.
  • What term covers the methods used to ensure activities are planned, ordered, timed, and to determine the overall project time?
  • The maximum output expected under normal operating conditions is called?
  • In a Matrix Organization, which statement is true about reporting?
  • Which of the following is an advantage of Mass Customization?
  • Efficiency capacity is defined as which ratio?
  • What information does a resource histogram convey?
  • Which term refers to setting goals, defining the project, creating a work breakdown structure, determining resources, and organizing the team?
  • What are the steps to create a simple schedule in a tool like MS Project from a WBS?
  • What is a schedule baseline and why is it important for performance measurement?
  • How is Schedule Variance (SV) defined and interpreted?
  • Which process strategy is typically associated with dedicated equipment for producing a single product or a small family of products?
  • Which of the following is NOT a component of a sanity check for schedule realism?
  • What is the primary characteristic that distinguishes a milestone from a regular activity in project schedules?
  • What is the purpose of a Work Breakdown Structure (WBS) in scheduling?
  • Why use a milestone schedule in stakeholder communications?
  • Which statement distinguishes analogous estimation from parametric estimation for durations?
  • Which metric represents the total time a unit spends in the production process from start to finish?
  • Which statement describes parametric estimation?
  • In earned value management, which metric represents the budgeted cost of planned work?
  • If a project calendar is not updated to reflect holidays and non-working days, what is the likely effect on the schedule?
  • What is a dummy activity and why is it used?
  • In project scheduling, what does a positive total float indicate?
  • Which steps describe how to conduct a schedule risk analysis and interpret results?
  • What term refers to planning, scheduling, and controlling project activities to meet objectives within time, cost, and quality limits?
  • How does PDM accommodate multiple dependency types and enable flexible sequencing compared to ADM?
  • Break-even in units is calculated as Fixed Costs divided by which quantity?
  • How does Earned Value Management (EVM) help monitor schedule performance?
  • Which statement accurately describes the relationship between fast tracking and crashing?
  • Distinguish hard dependencies from soft (discretionary) dependencies.
  • In earned value management, which index indicates schedule efficiency?
  • What are leads and lags in dependency relationships, and how do they modify timing?
  • Which pass computes the latest times (LS and LF) in a project network?
  • Which of the following statements is a common limitation of Gantt charts?
  • Which project scheduling technique identifies the longest path of activities that determines project completion time?
  • The maximum theoretical output under ideal conditions is called?
  • Which statement best defines CPI and SPI and how to interpret them?
  • Which statement best describes a buffer in a Critical Chain schedule?
  • Provide examples of lead time and lag time and their impact on starts and finishes.